1.Rehabilitation of Camatanan Water System

Phase   1   = 5   M
Phase 2 =   2.2 M

2. Rehab of Water Supply System:

  1. Cagmanaba = 517,000
  2. Gatbo = 517,000
  3. Guinaban = 517,000
  4. San Jose Oras = 517,000
  5. Sto. Nino           = 517,000
  6. Del Rosario       = 517,000
  7. San Antonio       = 517,000